Land Reclamation (Earthwork & Backfill)
Topsoil and backfill volumes, the truck loads to move them allowing for swell, and balancing spoil against pit volume.
PART 1
Topic Breakdown & Traps
The Engineering Principle
Reclamation re-establishes land after mining: spreading topsoil, backfilling voids and regrading spoil. Volumes are area times depth. Because excavated material bulks (swells), the loose volume to be hauled exceeds the in-situ (bank) volume by the swell factor — which sets the number of truck loads. A cut–fill balance checks whether the available spoil meets the backfill requirement.
The Core Formula Matrix
Layer volume: .
Loose volume / truck loads: ; loads .
Cut–fill balance: surplus .
Loose volume / truck loads: ; loads .
Cut–fill balance: surplus .
The ‘IIT Traps’
- ⚠Swell increases hauled volume; multiply bank volume by the swell factor for loose volume.
- ⚠Backfill volume is in-situ (compacted); convert loose spoil back to bank volume before comparing.
- ⚠Keep area and depth in consistent units before multiplying.
PART 2
Progressive 3-Tier Question Suite
Q1BASIC1 Mark · MCQ
Spreading topsoil deep over needs a topsoil volume of:
Q2MEDIUM2 Marks · NAT
Hauling that (swell factor ) in trucks needs ______ truck loads. (Round off to the nearest whole number.)
Q3HARD2 Marks · NAT
A spoil bank of loose (swell ) is used to backfill a pit of area to depth. The surplus in-situ volume is ______ m³. (Round off to the nearest whole number.)
m³